Kitchen prices
These are the kitchen bands from our published price guide, revised August 2026. Every figure includes VAT at 20%, so the figure you read is the figure to budget for.
Kitchen guide prices, including VAT
| Work | Guide price |
| Like-for-like refit, same layout | £6,000 – £22,800 |
| Full refit, new services and flooring | £13,200 – £36,000 |
| Refit with a knock-through | £22,800 – £50,400 |
Units and appliances are outside these bands when you are the one choosing and buying them. Handmade units are priced from the drawing.
What moves the price, roughly in order
- Whether the layout stays put. Leave the sink and hob where they are and most of the hidden work disappears. Move the sink across the room and it becomes a drainage job before it is a kitchen job.
- The worktop. Laminate, timber, quartz and granite are nowhere near each other on price.
- The appliances. One oven and four rings is a different job from twin ovens, induction, a wine cooler and a boiling tap.
- The floor. Whether it will take a tile as it is, or needs levelling, overboarding or a new screed first.
- The extraction route. A hob on an island needs a duct through the floor or ceiling, and that is a structural conversation.
- The fuse board. An old board with no spare capacity means a new consumer unit first.
A knock-through is a different job again: a steel, a Building Control inspection and a kitchen, in that order.
What the price includes
Included: stripping out the old kitchen and clearing it away, the builder's work around the kitchen, plumbing and electrical first and second fix, ducting, fitting the units, worktops, sink, taps and appliances, sealing, tiling to the areas agreed, making good and painting.
Not included unless written into your quotation: units and appliances you supply, a worktop you buy direct, floor coverings you are choosing, asbestos-containing floor tiles, a new consumer unit, moving the boiler, new windows, flooring outside the kitchen, a temporary kitchen and decorating beyond making good.
Paid directly by you on a knock-through: the structural engineer's calculations and the Building Control charge.
How you pay
A 5% deposit, then fortnightly valuations: every two weeks you pay for the work actually done, measured against your quotation. 5% is held back until practical completion. Any change you ask for is priced in writing and agreed before it is done.
Price match guarantee
We will never compromise on quality but we will match any like-for-like price.
We will match a like-for-like written quotation from another VAT-registered, insured builder within 30 days. Bring the other quotation to the survey and we will go through it against ours, line by line. Either we match it, or you find out what the cheaper figure leaves out. Ask us for the full terms.